Number of ADUs Allowed in Monterey Park

Number of ADUs Allowed in Monterey Park

How many ADUs can you build in Monterey Park?

You are allowed to put one attached or detached ADU on single-family property in Monterey Park, as well as one JADU.

How many ADUs does Monterey Park allow for multifamily properties?

Multifamily property owners in Monterey Park may convert existing uninhabitable space into at least one attached ADU, and additional ADUs not to exceed a maximum number equal to 25% of the existing units. Ergo:

 

  • From 2 to 7 units, you could convert existing uninhabitable space into one ADU
  • From 8 to 11 units up to 2 ADUs
  • From 12 to 15 units up to 3 ADUs
  • And so on.

No more than two detached ADUs may be constructed on a multifamily lot in Monterey Park.

Monterey Park ADU built by GO ADU Construction

ADU Monterey Park – Size & Building Constraints

What size detached ADU can you build in Monterey Park?

An detached ADU can be up to 1,200 square feet in Monterey Park.

How big can an attached ADU be in Monterey Park?

An attached ADU in Monterey Park can be up to 1,000 square feet, or 50% of the square footage of the primary dwelling unit, whichever is smaller.

What is the height requirement for an ADU in Monterey Park?

In Monterey Park, an ADU is limited to 16 feet of height.

Can you build a 2-story ADU in Monterey Park?

Monterey Park

Can you stack detached ADUs on top of each other?

Generally speaking, in Monterey Park detached ADUs cannot be stacked one on top of another, with one ADU on each story. Only one detached ADU is allowed on single-family property, and even on multifamily property height restrictions would prohibiti such a design.

Can you attach two ADUs to each other in Monterey Park?

Monterey Park rules do not specify whether two detached ADUs can be attached together within one structure, nor does California state law. Keep in mind that only multifamily property is allowed to have two detached ADUs on one property; single-family property is limited to one detached ADU. Plansmightget approved on multifamily property for two ADUs in one detached structure, but other ordinances for landscaping, setbacks, and separation. In practice, it is rare.

Can you build an ADU with an attached JADU?

No, a JADU is defined as an ADU converted from existing space within the main structure of the primary dwelling unit. As such, it cannot be attached to an ADU.

Does Monterey Park allow roof decks on ADUs?

Generally roof decks would be permitted on an ADU, but must meet the height restrictions for the zone. Roof decks cannot encroach into the required setbacks. As a rule of thumb, railings and access staircases above 42″ need to be included in height calculations.

What are the requirements for the exterior of the ADU?

An ADU must match or harmonize with the exterior of the main dwelling unit, including color palette, roof pitch, architectural style, and other aesthetic characteristics.

ADU interior in Monterey Park

ADU Setbacks in Monterey Park

What is the setback requirement for an ADU in Monterey Park?

ADUs behind the primary dwelling unit in Monterey Park require a minimum of 4-foot side and rear setbacks.

What is the minimum distance the ADU must be from existing structures?

The ADU must maintain sufficient distance from other structures on the property to comply with fire regulations — usually at least 4 or as much as 6 feet of separation between buildings.

Can you build an ADU in the front yard in Monterey Park?

City regulations do not explicitly prohibit an ADU in the front yard, but in practice it is very difficult, since the ADU must comply with front and side setback, building, landscaping, and aesthetic requirements.

ADU Setbacks in Monterey Park

Does Monterey Park require in-person submission of plans for an ADU?

No, plans can be submitted online via the city’sAcela Citizen Portal.

Does Monterey Park require a soils report for an ADU?

Monterey Park may require a soils report for ADU permitting to make sure the soil can support the new structure, especially if the ADU will be located on a hillside, an area with significant grading, or if there are special foundation requirements.

What landscaping requirements apply to ADUs in Monterey Park?

Specific requirements are not mentioned in the building code, but the building plans must allow for sufficient green space and permeable landscaping surface.

What is the plan check process with Monterey Park? How long does it take?

The plan check requires a review by the Building Division for zoning, building standards, and safety compliance. Turnaround times are not specified, but expect the process to take a matter of weeks.

Parking for Monterey Park ADU

What is the parking requirement for an ADU in Monterey Park?

One new parking spot is typically required to be added to the lot per new ADU. However, exemptions may apply if:

 

  • The ADU was built into an existing structure.
  • The property is located within a historic district.
  • The property is located within ½ mile walking distance of a public transportation stop.
  • The property is located within one block of an established vehicle share stop.
  • Off-street parking permits are required but not offered to ADU occupants.
Where can a parking space be located?

If a parking space must be added, it can be included on the driveway or any setback areas, and it may be configured as tandem parking.

Backyard ADU in Monterey Park

Additional Requirements in Monterey Park

Am I required to install solar panels?

Per Title 24 of the California Energy Code, solar panels of appropriate size and capacity are mandatory on new-construction ADUs. ADUs built from converted existing structures are exempt, as may be ADUs located under significant shading. Smaller ADUs may be subject to reduced or modified solar panel requirements.

Am I required to put separate electric and water meters for the ADU?

An ADU is not required to have a separate water or electrical meter. You can opt for the ADU to share service with the main dwelling unit. However, you can request separate water or electrical meters from the City of Monterey Park.

Does the ADU get its own address?

Monterey Park does not automatically assign a new ADU its own address. However, it may assign the ADU a new address if it is intended for rental or independent occupancy. The ADU will usually get a “½” designation — for example, an ADU located behind 1234 Pine Street would have the address “1234½ Pine Street.

What is LID (Low Impact Development)?

Low Impact Development (LID) is an approach to land development or redevelopment that seeks to preserve and conserve onsite water quality and natural features, with minimal detrimental effect to local waterways and ecosystems. The City of Monterey Park may require LID fees for larger ADUs.

Can I Airbnb my ADU? Use it as a short-term rental?

No, Airbnbs and other short-term rentals of any kind are not allowed in Monterey Park.

Will my ADU be rent-controlled?

Per the Costa-Hawkins Act of 1995, Monterey Park does not impose rent control on dwellings constructed after February 1, 1995. This means most new-build ADUs are exempt. However, if the primary dwelling unit is subject to rent control, it might apply to the ADU as well.

Can I use gas appliances in my new ADU?

While encouraging the use of electric appliances for efficiency and sustainability, Monterey Park does not prohibit gas appliances in new ADUs as long as all relevant installation and safety standards are met.

Am I required to put fire sprinklers in my ADU?

​​In Monterey Park you are only required to install sprinklers in a new ADU if the primary dwelling unit has them as well. You may also be required to install them if the ADU is located within a special fire hazard zone.

Have Additional Questions?