Understanding Municipal Boundaries: City of Pasadena vs. Surrounding Areas

Before reviewing zoning rules, verify that your parcel lies within the incorporated City of Pasadena. Southern California municipal borders often intertwine, but building departments do not:

  • City of Pasadena (This Guide): Governed by the Pasadena Municipal Code (PMC Title 17) and processed through the Pasadena Permit Center / Planning & Community Development Department.
  • City of South Pasadena (Distinct): An independent incorporated municipality with its own separate zoning code, city council, and building department.
  • City of Los Angeles (Distinct): Governed by the Los Angeles Municipal Code (LAMC) and the Los Angeles Department of Building and Safety (LADBS).
  • Unincorporated Los Angeles County (Distinct): Communities bordering Pasadena (such as parts of Altadena or East Pasadena) are governed by the Los Angeles County Department of Regional Planning (DRP) and LA County Public Works, not City of Pasadena municipal offices.

If your property is located in the incorporated City of Pasadena, the following municipal standards apply to your parcel. Zoning staff confirm the rules that apply to your specific address — a quick check before design starts can save a redesign.


How Many ADUs Can You Build on Your Pasadena Property?

Pasadena zoning accommodates accessory dwelling units on both single-family and multifamily residential parcels, under state law (Gov. Code §§ 66310–66342) and Pasadena Municipal Code § 17.50.275 (as amended through Ordinance No. 7471).

Homeowners with an existing or proposed single-family dwelling may combine up to three accessory units: 1. One new-construction ADU: Built new, either detached in the yard or attached to the home. 2. One converted ADU: Created within existing space — such as a garage, carriage house, pool house, or similar accessory structure (or within the home itself). Conversions of an accessory structure may expand by up to 150 square feet, limited to accommodating ingress and egress. 3. One Junior Accessory Dwelling Unit (JADU): Limited to 500 square feet, built entirely within the walls of the existing or proposed single-family residence (including an attached garage), with its own exterior entrance.

An "exemption ADU" — a new-construction unit of up to 800 square feet with four-foot side and rear setbacks (and a four-foot front setback) — receives the state's most streamlined ministerial review, with no parking required and no additional zone development standards applied.


Maximum Size Allowances for Pasadena ADUs

The allowable square footage depends on unit type, lot configuration, and whether the unit qualifies as an "exemption ADU" under state law:

ADU Configuration Maximum Size Key Requirements
Exemption ADU (new construction, attached or detached) Up to 800 sq. ft. Four-foot side, rear, and front setbacks; ministerial approval; no parking required
Detached ADU, new construction (single-family) Up to 1,200 sq. ft. Reduced to 1,000 sq. ft. in most Hillside Overlay areas, and to 800 sq. ft. on hillside streets with pavement 26 feet wide or narrower
Attached ADU, new construction 850 sq. ft. (studio or 1-bedroom); 1,000 sq. ft. (2+ bedrooms) A percentage-of-primary-dwelling limit may apply to ordinance-based attached units, but state law protects an ADU of at least 800 square feet from being prohibited by that percentage limit. Confirm the applicable approval path and size allowance for your design.
Conversion ADU (attached or detached) No size limit Plus up to 150 sq. ft. of expansion for ingress/egress only
Junior ADU (JADU) 500 sq. ft. Within the walls of the primary residence, including an attached garage
Detached ADU (multifamily lot) Per state exemptions; height and setback standards apply See unit counts above

Every ADU must be at least 150 square feet. Applicants may choose whether floor area is measured under the Zoning Code or the California Building Code — worth confirming with your designer if your project sits near a threshold.

Note on fees: on single-family sites, Pasadena exempts ADUs of 900 square feet or less from its Residential Impact Fees (RIF) — a local threshold more generous than the state's 750-square-foot fee exemption. See the FAQ below for the full fee picture.


Setback Requirements & Building Separation

Setbacks ensure adequate emergency egress, fire separation, privacy, and utility clearance between neighboring parcels.

  • Side & Rear Setbacks (New Construction): A minimum of 4 feet from side and rear property lines is required for newly constructed ADUs and for expansions to conversion ADUs.
  • Conversions of Existing Structures: Converting an existing legal structure into an ADU requires no additional setbacks beyond fire-safety needs. If an existing structure is demolished and rebuilt in the same location with the same dimensions and height, no setbacks are required except for fire safety.
  • Front Yard Setbacks: New-construction ADUs larger than 800 square feet must comply with the underlying zone's front-yard setback. State law prohibits using front-setback rules to prevent an 800-square-foot ADU with four-foot side and rear setbacks from being built, and Pasadena permits exemption ADUs with a four-foot front setback.
  • Building Separation: For non-exemption ADUs, a minimum building separation of six feet (eave to eave) is required between a newly constructed ADU and any other structure on the site (excluding walls and fences).

Building Heights & Stories

Height limits depend on unit type, site conditions, and location:

  • Detached New-Construction ADU (single-family): Standard maximum of 18 feet and two stories. A lower 16-foot cap applies within Hillside Overlay Districts, within Landmark or Historic Districts where the unit is visible from the street, and for exemption ADUs located in the front-yard setback — but those same units return to 18 feet if the site has an existing or proposed multistory building or lies within one-half mile walking distance of a Major Transit Stop or High Quality Transit Corridor.
  • Roof Pitch Allowance: On sites within one-half mile walking distance of a Major Transit Stop or High Quality Transit Corridor, an additional two feet of height is permitted where necessary to match the roof pitch of the primary dwelling.
  • Attached ADU: Maximum 25 feet or the height limit of the underlying zone, whichever is lower, and up to two stories.
  • Detached ADUs (multifamily lots): Maximum 16 feet, rising to 18 feet if the multifamily building is multistory or the lot is near a Major Transit Stop or High Quality Transit Corridor (plus two feet for roof pitch matching near transit).
  • Conversions: Converted structures keep their existing legal height and dimensions.
  • Applicant's Choice of Measurement: Pasadena lets the applicant choose whether height (and floor area) is measured under the Zoning Code or the California Building Code — a detail that can decide close cases.

Parking Rules and Transit Exemptions


Special Pasadena Requirements: Historic Districts, Energy Codes, Utilities & Rentals


The Pasadena ADU Permitting Process: Step by Step

Permitting an ADU involves structured technical coordination between property owners, designers, and municipal plan examiners:

Step 1: Feasibility & Zoning Check Confirm parcel boundaries, underlying zoning district, utility easements, and overlay zones (Historic or Hillside). │ ▼ Step 2: Architectural & Structural Drafting Prepare site plans, floor plans, elevations, Title 24 energy calculations, and structural framing notes. │ ▼ Step 3: Online Submittal via Pasadena's Permit Portal Submit electronic plans through the City's online permit portal (cityofpasadena.net/mypermits). │ ▼ Step 4: Departmental Plan Check Review Plans undergo multi-department review: Planning & Zoning, Building & Safety, Fire, Public Works, and Pasadena Water & Power. │ ▼ Step 5: Plan Corrections & Clearance Incorporate plan check comments, submit revised plan sheets, pay remaining permit fees, and receive issued permits.

Under California Government Code section 66317, the permitting agency must determine whether an ADU application is complete and give written notice within 15 business days. If it does not make a timely determination, the application is deemed complete. For a lot with an existing single-family or multifamily dwelling, the agency must generally approve or deny a completed ADU application within 60 days. If the ADU application accompanies an application for a new primary dwelling, the agency may delay its decision until it decides that primary-dwelling application. An applicant-requested delay pauses the 60-day period. The statute provides for deemed approval when the agency does not approve or deny the completed application within the applicable period. Review is ministerial, without discretionary review or a hearing. These decision deadlines are not a guarantee of the total time for design, all permits or construction.


Frequently Asked Questions About Pasadena ADUs


Plan Your Pasadena ADU with Go ADU Construction

Every property in Pasadena brings its own parcel dimensions, setback geometry, overlay questions, and utility conditions. Go ADU Construction builds ADUs in Pasadena and works with homeowners to plan around the City's current requirements — from early feasibility through permitting and construction.

Connect with our Pasadena project team to discuss your property's potential:

Discuss Your Pasadena ADU Project

Explore our local construction capabilities, completed project profiles, and Pasadena neighborhood coverage on our Pasadena Service Area Page.