Number of ADUs Allowed in Temple City

Number of ADUs Allowed in Temple City

How many ADUs can you build in Temple City?

You are allowed to put one attached or detached ADU on single-family property in Temple City, as well as one JADU.

How many ADUs does Temple City allow for multifamily properties?

Multifamily property owners in Temple City may convert existing uninhabitable space into at least one attached ADU, and additional ADUs not to exceed a maximum number equal to 25% of the existing units. Ergo:

 

  • From 2 to 7 units, you could convert existing uninhabitable space into one ADU
  • From 8 to 11 units up to 2 ADUs
  • From 12 to 15 units up to 3 ADUs
  • And so on.

Up to 8 detached ADUs can be built on multifamily property, as long as the number of detached ADUs does not exceed the current number of units on the property.

Temple City ADU built by GO ADU Construction

ADU Temple City – Size & Building Constraints

What size detached ADU can you build in Temple City?

A detached studio ADU can be up to 600 square feet, while a detached one-bedroom ADU can be up to 850 square feet, and a detached two-bedroom ADU can be up to 1,000 square feet.

How big can an attached ADU be in Temple City?

An attached ADU in Temple City can be up to 800 square feet, or 50% of the square footage of the primary dwelling unit, whichever is smaller.

What is the height requirement for an ADU in Temple City?

An ADU in Temple City can usually be built to a maximum height of 16 feet.

Can you build a 2-story ADU in Temple City?

The maximum height requirement of 16 feet effectively prohibits you from building a two-story ADU in Temple City.

Can you stack detached ADUs on top of each other?

Two-story ADUs are not allowed in Temple City, so you cannot have two ADUs stacked one on top of another with one on each story of a two-story structure.

Can you attach two ADUs to each other in Temple City?

Since only one ADU is allowed on single-family property in Temple City, you cannot have two ADUs attached to one another in one structure. Detached structures containing multiple ADUs may be permitted on multifamily property.

Can you build an ADU with an attached JADU?

No, a JADU is defined as an ADU converted from existing space within the main structure of the primary dwelling unit. As such, it cannot be attached to an ADU.

Does Temple City allow roof decks on ADUs?

Generally roof decks would be permitted on an ADU, but must meet the height restrictions for the zone. Roof decks cannot encroach into the required setbacks. As a rule of thumb, railings and access staircases above 42″ need to be included in height calculations.

What are the requirements for the exterior of the ADU?

An ADU must match or harmonize with the exterior of the main dwelling unit, including color palette, roof pitch, architectural style, and other aesthetic characteristics (similar to a garage conversion).

ADU interior in Temple City

ADU Setbacks in Temple City

What is the setback requirement for an ADU in Temple City?

ADUs behind the primary dwelling unit in Temple City require a minimum of 4-foot side and rear setbacks.

What is the minimum distance the ADU must be from existing structures?

A detached ADU must be at least 15 feet from existing habitable structures.

Can you build an ADU in the front yard in Temple City?

ADUs are not permitted in the front yard of residential property in Temple City.

ADU Setbacks in Temple City

Does Temple City require in-person submission of plans for an ADU?

No, you can use the city’s electronic plan check system. The portal can be foundhere.

Does Temple City require a soils report for an ADU?

Temple City may require a soils report for ADU permitting to make sure the soil can support the new structure, especially if the ADU construction will be located on a hillside, an area with significant grading, or if there are special foundation requirements.

What landscaping requirements apply to ADUs in Temple City?

Sufficient green space and permeable surface must be maintained on the property. City regulations do not specify specific percentages and must be approved on a case-by-case basis in the planning stage.

What is the plan check process with Temple City? How long does it take?

Plans are submitted to the Temple City Building and Safety Division, which checks the plans for compliance with building codes, safety codes, and structural integrity. Turnaround times can vary, but the process takes an average of two weeks.

Parking for Temple City ADU

What is the parking requirement for an ADU in Temple City?

One new parking spot is typically required to be added to the lot per new ADU. However, exemptions may apply if:

 

  • The ADU was built into an existing structure.
  • The property is located within a historic district.
  • The property is located within ½ mile walking distance of a public transportation stop.
  • The property is located within one block of an established vehicle share stop.
  • Off-street parking permits are required but not offered to ADU occupants.
Where can a parking space be located?

If a parking space must be added, it can be included on the driveway or any setback areas, and it may be configured as tandem parking.

Backyard ADU in Temple City

Additional Requirements in Temple City

Am I required to install solar panels?

Per Title 24 of the California Energy Code, solar panels of appropriate size and capacity are mandatory on new-construction ADUs. ADUs built from converted existing structures are exempt, as may be ADUs located under significant shading. Smaller ADUs may be subject to reduced or modified solar panel requirements.

Am I required to put separate electric and water meters for the ADU?

An ADU is not required to have a separate water or electrical meter. You can opt for the ADU to share service with the main dwelling unit. However, you can request separate water or electrical meters from the City of Temple City.

Does the ADU get its own address?

An ADU doesn’t necessarily get its own address, but a separate address can be applied for and may be mandated if determined by the city to be necessary for public safety reasons.

What is LID (Low Impact Development)?

Low Impact Development (LID) is an approach to land development or redevelopment that seeks to preserve and conserve onsite water quality and natural features, with minimal detrimental effect to local waterways and ecosystems. The City of Temple City may require LID fees for larger ADUs.

Can I Airbnb my ADU? Use it as a short-term rental?

You can, but California State Law requires that dwelling units can only be used as short-term rentals or Airbnbs for terms of 30 days or longer.

Will my ADU be rent-controlled?

Per the Costa-Hawkins Act of 1995, Temple City does not impose rent control on dwellings constructed after February 1, 1995. This means most new-build ADUs are exempt. However, if the primary dwelling unit is subject to rent control, it might apply to the ADU as well.

Can I use gas appliances in my new ADU?

While encouraging the use of electric appliances for efficiency and sustainability, Temple City does not prohibit gas appliances in new ADUs as long as all relevant installation and safety standards are met.

Am I required to put fire sprinklers in my ADU?

​​In Temple City you are only required to install sprinklers in a new ADU if the primary dwelling unit has them as well. You may also be required to install them if the ADU is located within a special fire hazard zone.

Have Additional Questions?